Moulin à Vent Solar Farm
Sector: Power Generation (CCGT) • Location: St. Clement, Jersey
Source: The Cool Down
Jersey's first solar farm, the Moulin à Vent solar farm in St. Clement, has outperformed electricity generation forecasts by 25% to 30% since coming into operation. The 4.3-megawatt-peak site contributes to Jersey Electricity's Solar 5000 strategy to produce enough solar electricity for 5,000 homes by 2030, with additional planned solar farms in St. John and St. Mary.
- Status
- Under Construction
- Sector
- Power Generation (CCGT), Solar, Raw Materials
- Location
- St. Clement, United Kingdom
- Updated
- 22 Jul 2026
- Source
- The Cool Down
ConstructChat
Ask ConstructChat about Moulin à Vent Solar Farm
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | operational |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Jersey's first solar farm, the Moulin à Vent solar farm in St. Clement, has outperformed electricity generation forecasts by 25% to 30% since coming into operation. The 4.3-megawatt-peak site contributes to Jersey Electricity's Solar 5000 strategy to produce enough solar electricity for 5,000 homes by 2030, with additional planned solar farms in St. John and St. Mary. |
Original sector | Energy |
Location
Country | United Kingdom (UK) |
City | St. Clement |
Source
Source | The Cool Down |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Solar, Raw Materials |
Article published date | 2026-05-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
