logo
ProjectClosed

Mound Road Extension Segment 2

One of 10,000+ projects Taiyo tracks in Texas.

Source: Dodge USA

This project extends Mound Road 0.86 miles east of Greenhouse Road to Cypress Drive. The project starts with a 41 foot wide concrete pavement section that connects to a separate project (Segment 1). The pavement section will then transition to a 24 foot wide asphalt pavement section. Pavement will end in a cul-de-sac. The existing railroad crossing at Cypress Drive will be closed at the completion

Status
Closed
Sector
Water Supply and Storage, Road, Commercial, Rail, Waste Processing and Treatment, Cement, Government
Location
Houston, Texas, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Mound Road Extension Segment 2

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Mound Road Extension Segment 2” is an infrastructure initiative in the Water Supply and Storage sector, located in Houston, Texas, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This project extends Mound Road 0.86 miles east of Greenhouse Road to Cypress Drive. The project starts with a 41 foot wide concrete pavement section that connects to a separate project (Segment 1). The pavement section will then transition to a 24 foot wide asphalt pavement section. Pavement will end in a cul-de-sac. The existing railroad crossing at Cypress Drive will be closed at the completion of the project. The project is approximately 2,000 feet in length. Drainage will be a combinatio...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Texas

City

Houston

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Road, Commercial, Rail, Waste Processing and Treatment, Cement, Government

Article published date

2024-11-11

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project