logo

Mount Coffee Hydropower Plant Rehabilitation

Sector: Hydro • Location: Liberia

Source: European Union Africa Infrastructure Trust Fund

Project
Close

The rehabilitation of the Mount Coffee Hydropower Plant in Liberia aims at restoring the plant’s capacity to its pre-war status of 64 MW.  It will be a key part of the CLSG grid developed under the West African Power Pool (WAPP), allowing Liberia to export electricity. It will also create the stabilising generation point (voltage stability) for the transmission line being implemented under the CL

Project Information FAQ

Project Information

4 Q
The project “Mount Coffee Hydropower Plant Rehabilitation” is an infrastructure initiative in the Hydro sector, located in Liberia. Taiyo aggregates data on it from European Union Africa Infrastructure Trust Fund.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Close

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The rehabilitation of the Mount Coffee Hydropower Plant in Liberia aims at restoring the plant’s capacity to its pre-war status of 64 MW.  It will be a key part of the CLSG grid developed under the West African Power Pool (WAPP), allowing Liberia to export electricity. It will also create the stabilising generation point (voltage stability) for the transmission line being implemented under the CLSG Project. The project is in operation since December 2016. The EU-AITF TA grant was used by the West African Power Pool for the funding of consultancy services to undertake technical studies and preparation of bidding documents as well as an Environmental and Social Impact Assessment (ESIA) and a Resettlement Action Plan (RAP) for the Project. The Technical Studies and the ESIA study were completed in November 2013 and October 2013, respectively. The deliverables from the ESIA and Preparation of RAP included 1) Scoping Report; 2) Environmental Impact Statement; 3) Environmental and Social Management Plan; 4) Resettlement Action Plan. The conduct of the study also included comprehensive public consultation and sensitization exercises. The ESIA funded by this Project can be accessed here:http://mtcoffeeliberia.com/wp-content/uploads/2013/02/FINAL-MtCoffee_ESIA-Rep-12-10-16-FOR-PUBLICATION_sm2.pdf

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

Low

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data