Mount James Wind Farm
One of 4,275 projects Taiyo tracks in Queensland.
Source: RenewEconomy
The Mount James wind project in Queensland is a 1 gigawatt wind farm where the developers propose to use shorter turbines with longer blades to halve the project's footprint while increasing its capacity by 195 MW. The project involves installing 7.2 MW turbines with a 166m hub height and 84m blades, increasing the swept area and energy generation efficiency. The redesign reduces the operational f
- Status
- Prospective
- Sector
- Energy Storage, Raw Materials, Wind
- Location
- Hughenden, Queensland, Australia
- Updated
- 22 Jul 2026
- Source
- RenewEconomy
ConstructChat
Ask ConstructChat about Mount James Wind Farm
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Company |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Mount James wind project in Queensland is a 1 gigawatt wind farm where the developers propose to use shorter turbines with longer blades to halve the project's footprint while increasing its capacity by 195 MW. The project involves installing 7.2 MW turbines with a 166m hub height and 84m blades, increasing the swept area and energy generation efficiency. The redesign reduces the operational footprint by 40% to about 700 hectares and includes plans for a battery and on-site gravel pits. |
Original sector | Renewable Energy |
Budget |
Location
Country | Australia |
State | Queensland |
City | Hughenden |
Source
Source | RenewEconomy |
URL |
More Details
Record type | Project |
Sector | Energy Storage, Raw Materials, Wind |
Article published date | 2025-09-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
