Mount Sinai Health System ICU Expansion
The owner, status and timeline of this project. A free account opens every field.
Source: Healthcare Design Magazine
Mount Sinai Health System has started construction on a 13-bed intensive care unit (ICU) in Queens, New York. The project will add 13 ICU beds to the hospital's existing eight and include a Class 2 procedure room designed to support moderate-risk surgical or interventional procedures. Construction is expected to take 16 months to complete.
- Status
- Under Construction
- Sector
- Commercial, Hospital
- Location
- Queens, New York, United States of America
- Updated
- 22 Jul 2026
- Source
- Healthcare Design Magazine
ConstructChat
Ask ConstructChat about Mount Sinai Health System ICU Expansion
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Mount Sinai Health System has started construction on a 13-bed intensive care unit (ICU) in Queens, New York. The project will add 13 ICU beds to the hospital's existing eight and include a Class 2 procedure room designed to support moderate-risk surgical or interventional procedures. Construction is expected to take 16 months to complete. |
Original sector | Healthcare |
Location
Country | United States of America (USA) |
State | New York |
City | Queens |
Source
Source | Healthcare Design Magazine |
URL |
More Details
Record type | Project |
Sector | Commercial, Hospital |
Article published date | 2026-05-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in United States
- Engineering, Procurement, and Construction of Third Bosphorus Bridge
- Tampa Bay Seawater Desalination Plant
- Portugues Dam, Ponce
- Sinking Creek Wastewater Treatment Plant Expansion, Tennessee
- Carlsbad Desalination Project, San Diego, California
- Joint Base Lewis-McChord
- Fort Riley Army Base, Kansas
- Fort Benning, Georgia
