logo
ProjectCompleted

Mount Stewart Rte 2 Structure

One of 4,618 projects Taiyo tracks in Prince Edward Island.

Source: Infrastructure Canada

The replacement of a highway structure on Route 2 in Mount Stewart. The scope includes: - Installation of environmental controls (silt fences, straw mulch, silt booms, check dams, retention ponds, and others as required) - Clearing and grubbing of vegetation locally within the project site - Excavation of earthen material to gain access to the structure for removal - Removal and disposal of the ex

Status
Closed
Sector
Cement, Road, Government
Location
Prince Edward Island, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about Mount Stewart Rte 2 Structure

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Mount Stewart Rte 2 Structure” is an infrastructure initiative in the Cement sector, located in Prince Edward Island, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Sponsoring Agency

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The replacement of a highway structure on Route 2 in Mount Stewart. The scope includes: - Installation of environmental controls (silt fences, straw mulch, silt booms, check dams, retention ponds, and others as required) - Clearing and grubbing of vegetation locally within the project site - Excavation of earthen material to gain access to the structure for removal - Removal and disposal of the existing structure - Provision of temporary stream alignment in order to install new structure(s) in the dry - Construct forms, place reinforcement bars, and pour concrete footings; install new pre-cast concrete arch structure - Supply, placement and compaction of suitable backfill material - Install new guardrail - Supply, placement and compaction of roadway base gravels and asphalt base and wearing surface - Supply and placement of topsoil and hydroseed - Site clean-up and demobilize. Schedule would be from Sept. 2022 to November 2022.

Original sector

Roads, Bridges and Trade Infrastructure

Location

Country

Canada

State

Prince Edward Island

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Cement, Road, Government

Article published date

2025-07-06

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project