Completed

The replacement of a highway structure on Route 2 in Mount Stewart. The scope includes: - Installation of environmental controls (silt fences, straw mulch, silt booms, check dams, retention ponds, and others as required) - Clearing and grubbing of vegetation locally within the project site - Excavation of earthen material to gain access to the structure for removal - Removal and disposal of the ex

Project Information FAQ

Project Information

3 Q
The project “Mount Stewart Rte 2 Structure” is an infrastructure initiative in the Cement sector, located in Prince Edward Island, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The replacement of a highway structure on Route 2 in Mount Stewart. The scope includes: - Installation of environmental controls (silt fences, straw mulch, silt booms, check dams, retention ponds, and others as required) - Clearing and grubbing of vegetation locally within the project site - Excavation of earthen material to gain access to the structure for removal - Removal and disposal of the existing structure - Provision of temporary stream alignment in order to install new structure(s) in the dry - Construct forms, place reinforcement bars, and pour concrete footings; install new pre-cast concrete arch structure - Supply, placement and compaction of suitable backfill material - Install new guardrail - Supply, placement and compaction of roadway base gravels and asphalt base and wearing surface - Supply and placement of topsoil and hydroseed - Site clean-up and demobilize. Schedule would be from Sept. 2022 to November 2022.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data