Mountain Avenue Culvert Replacement
Sector: Steel • Location: Franklin Lakes, New Jersey, United States of America
Source: Dodge USA
The work to be performed under this contract includes replacing the existing 42 CMP with 36 RCP. The work includes replacing the headwalls with new concrete structures and existing 15 RCP with new 15 RCP, and installing natural stone walls and beam guide rails as shown on the project plans. Principal items of work in the project include: L.S. Clearing Site 230 C.Y. Excavation, Unclassified 32 L.F.
- Status
- Prospective
- Sector
- Steel, Rail, Cement, Water Supply and Storage, Waste Processing and Treatment, Government, Metal, Commercial
- Location
- Franklin Lakes, New Jersey, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Mountain Avenue Culvert Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work to be performed under this contract includes replacing the existing 42 CMP with 36 RCP. The work includes replacing the headwalls with new concrete structures and existing 15 RCP with new 15 RCP, and installing natural stone walls and beam guide rails as shown on the project plans. Principal items of work in the project include: L.S. Clearing Site 230 C.Y. Excavation, Unclassified 32 L.F. 36 Reinforced Concrete Pipe 15.0 C.Y. Concrete Headwall 2,500 LBS. Reinforcement Steel, Epoxy Co... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New Jersey |
City | Franklin Lakes |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Steel, Rail, Cement, Water Supply and Storage, Waste Processing and Treatment, Government, Metal, Commercial |
Article published date | 2024-08-12 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Steel projects in United States of America
- I-285 @ CR 220/CLARK HOWELL ROAD - REHAB BOX BEAMS
- BRIDGE PRESERVATION @ 6 LOCS IN DISTRICT 4
- DEFERRED SUBMITTAL FOR 201908286: 7 FT WROUGHT IRON FENCE & ENTRY GATE, SOLAR POWERED.
- Pacific Visions Wing at the Aquarium of the Pacific
- WilmerHale Tenant Fit-Out
- UW Seismic Improvements
- DCA Terminal A Improvements
- Kansas City International Airport (MCI) New Single Terminal
