Mountain Bluff Rock Slope Stabilization
Start · British Columbia · Last reported Jul 2019
Source: Dodge USA
The general nature of the work to be carried out under the contract consist of bus is not necessarily limited to the following: Rock scaling 7,000 m of slope to remove loose rock and debris. Supply and install 144 linear metres of rock bolts. Approximately 24 bolts are required. Supply and install 156 m of shotcrete. Supply and install 6,240 m of gabion mesh. Install 580 m of tecco mesh.
- Status
- Prospective
- Sector
- Commercial, Road, Manufacturing (Industrial)
- Location
- Coquitlam, British Columbia, Canada
- Updated
- 19 Nov 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Mountain Bluff Rock Slope Stabilization
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | start |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The general nature of the work to be carried out under the contract consist of bus is not necessarily limited to the following: Rock scaling 7,000 m of slope to remove loose rock and debris. Supply and install 144 linear metres of rock bolts. Approximately 24 bolts are required. Supply and install 156 m of shotcrete. Supply and install 6,240 m of gabion mesh. Install 580 m of tecco mesh. |
Procurement method |
Location
Country | Canada |
State | British Columbia |
City | Coquitlam |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Road, Manufacturing (Industrial) |
Article published date | 2023-05-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in Canada
- Site C Worker Accommodation
- Transport and Rescue Squadron Hangar Facility - 19 Wing CFB Comox 442
- Thornwood Residences Phase 2
- Canadian Tire Corporate Office Interior Renovation
- St. Stephen Border Crossing
- Aqsarniit Hotel and Convention Centre
- Safeway Refrigerated Warehouse
- International Brotherhood of Boilermakers Training Centre and Union Hall
