logo

Mountain Tunnel Improvements

Sector: Cement • Location: United States of America (USA)

Source: ENR News

Project
Open For Bidding

The San Francisco Public Utilities Commission is seeking bidders to carry out improvements to Mountain Tunnel. The 19-mile long water tunnel, located in Tuolumne County, which has been in service since 1925, is unlined upstream for over 7 miles and has an unreinforced concrete lining for 11 miles in its downstream section. Inspections have revealed deterioration of the tunnel lining and other defi

Project Information FAQ

Project Information

5 Q
The project “Mountain Tunnel Improvements” is an infrastructure initiative in the Cement sector, located in United States of America (USA). Taiyo aggregates data on it from ENR News.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

open for bidding

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The San Francisco Public Utilities Commission is seeking bidders to carry out improvements to Mountain Tunnel. The 19-mile long water tunnel, located in Tuolumne County, which has been in service since 1925, is unlined upstream for over 7 miles and has an unreinforced concrete lining for 11 miles in its downstream section. Inspections have revealed deterioration of the tunnel lining and other deficiencies, resulting in reduced flow rate, increased groundwater intrusion and increased turbidity. The repairs and improvements include: repairing with wired mesh and shotcrete the defects in the 11 miles of existing tunnel lining; constructing a new 1,075-foot adit tunnel at Priest Reservoir to improve maintenance access; constructing a new flow control facility with large flow control valves at the downstream end of the tunnel near Priest Reservoir to better control pressure in the tunnel, help protect the tunnel lining and improve operational flexibility; placing concrete along 5,000 ft of the floor of the unlined portions of the tunnel to improve maintenance access and improve hydraulic flow; and constructing a 750-ft bypass tunnel (siphon extension) at South Fork Siphon. The work will take place over seven years, including five winter shutdowns (when water demand is lowest). The project is valued at $140 million.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data