Mountain View Road Culvert 1348 Replacement
Bidding · Washington · Last reported Dec 2024
Source: Dodge USA
Mountain View Road Culvert 1348 to be replaced with 24" Diameter Steel pipe by Trenchless Replacement method and other work, all in accordance with the attached Contract Plans, these Contract Provisions, and the Standard Specifications.
- Status
- Prospective
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Steel, Government, Road, Commercial, Metal
- Location
- Camano, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Mountain View Road Culvert 1348 Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Mountain View Road Culvert 1348 to be replaced with 24" Diameter Steel pipe by Trenchless Replacement method and other work, all in accordance with the attached Contract Plans, these Contract Provisions, and the Standard Specifications. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Camano |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Steel, Government, Road, Commercial, Metal |
Article published date | 2024-12-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
