Mountain View YDC Hardware Security Facility Upgrades REBID
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
BRIEF PROJECT DESCRIPTION: Installation of new smoke evacuation system multiple buildings. Installation of new generator to provide power for smoke evacuation systems. Installation of new doors and hardware. Installation of replacement generator for building emergency lighting and security systems. Installation of new security and surveillance camera system.
- Status
- Under Construction
- Sector
- Power Generation (CCGT), Commercial, Manufacturing (Industrial)
- Location
- Dandridge, Tennessee, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Mountain View YDC Hardware Security Facility Upgrades REBID
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | GC Bidding |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | BRIEF PROJECT DESCRIPTION: Installation of new smoke evacuation system multiple buildings. Installation of new generator to provide power for smoke evacuation systems. Installation of new doors and hardware. Installation of replacement generator for building emergency lighting and security systems. Installation of new security and surveillance camera system. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Tennessee |
City | Dandridge |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Commercial, Manufacturing (Industrial) |
Article published date | 2024-10-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 77 @ FALLING CREEK 6.1 MI S OF ELBERTON
- VALDOSTA - AIRFIELD ELECTRICAL IMPROVEMENTS
- CR 423/MOUNT OLIVE ROAD @ SANDY CREEK NW OF DUBLIN
- DISTWIDE STUDY REMOVAL/RELOCATION OF UTILITY POLES DIST 3
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
