Mozambique - Electricity IV Project
Sector: Power Generation (CCGT) • Location: Mozambique
Source: African Development Bank (AfDB)
The Electricity IV Project is designed by the Government of the Republic of Mozambique with the support of the African Development Fund (ADF). The project includes the following components: i) construction of 167 km 220 kV transmission line with optical fiber ground wire; (ii) construction of Substations; (iii) construction of Distribution Network; (iv) supply and Installation of Energy Meters; an
- Sector
- Power Generation (CCGT), Government
- Location
- Mozambique
- Updated
- 22 Jul 2026
- Source
- African Development Bank (AfDB)
ConstructChat
Ask ConstructChat about Mozambique - Electricity IV Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Electricity IV Project is designed by the Government of the Republic of Mozambique with the support of the African Development Fund (ADF). The project includes the following components: i) construction of 167 km 220 kV transmission line with optical fiber ground wire; (ii) construction of Substations; (iii) construction of Distribution Network; (iv) supply and Installation of Energy Meters; and (v) project Engineering, Supervision and Management. |
Original sector | Energy |
Budget |
Location
Country | Mozambique |
Source
Source | African Development Bank (AfDB) |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Government |
Article published date | 2025-03-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
