Mozambique - Electricity Master Plan Study
Sector: Commercial • Location: Mozambique
Source: African Development Bank (AfDB)
The proposed Electricity Master Plan together with the ongoing ‘Rural Electrification Strategic Plan for Mozambique’ study and ‘Mepanda Uncua and Cahora Bassa North Project Feasibility Study’ will provide the Government a comprehensive Least Cost Investment Plan (LCIP) for the power sub-sector in the medium-to-short term. The availability of the LCIP will enable the Government to implement project
- Sector
- Commercial, Power Generation (CCGT), Government
- Location
- Mozambique
- Updated
- 22 Jul 2026
- Source
- African Development Bank (AfDB)
ConstructChat
Ask ConstructChat about Mozambique - Electricity Master Plan Study
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The proposed Electricity Master Plan together with the ongoing ‘Rural Electrification Strategic Plan for Mozambique’ study and ‘Mepanda Uncua and Cahora Bassa North Project Feasibility Study’ will provide the Government a comprehensive Least Cost Investment Plan (LCIP) for the power sub-sector in the medium-to-short term. The availability of the LCIP will enable the Government to implement project on rational basis, and mobilise investment capital to advance electrification. The Bank, through the proposed intervention, will therefore assist the Government to put the necessary ground for advancing electrification for socio-economic development. The study will involve (a) technical studies (load forecast, network configuration, load flow and stability analyses, and LDC configuration); (b) crosscutting issues analyses (environmental, poverty reduction and gender mainstreaming), (c) investment and operational cost analyses; (d) institutional and tariff structure analyses, and (e) funding sources analyses. The proposed study will be completed in twelve (12) calendar months with a total cost, net of taxes and duties, is estimated at UA 1.068 million.. |
Original sector | Energy |
Budget |
Location
Country | Mozambique |
Source
Source | African Development Bank (AfDB) |
URL |
More Details
Record type | Project |
Sector | Commercial, Power Generation (CCGT), Government |
Article published date | 2025-12-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in Mozambique
- Metoro solar power plant
- Kuvaninga Energia power plant
- Namaacha wind farm
- Companhia de Sena S.A.R.L.
- Motorcare Limitada
- Mozambique - Drought Recovery and Agriculture Resilience Project (DRARP)
- Integrated Water Supply and Sanitation Project
- Mozambique - Supplementary Loan to Montepuez - Lichinga Road Project
