logo
Project

Mozambique - Electricity Master Plan Study

Sector: Commercial • Location: Mozambique

Source: African Development Bank (AfDB)

The proposed Electricity Master Plan together with the ongoing ‘Rural Electrification Strategic Plan for Mozambique’ study and ‘Mepanda Uncua and Cahora Bassa North Project Feasibility Study’ will provide the Government a comprehensive Least Cost Investment Plan (LCIP) for the power sub-sector in the medium-to-short term. The availability of the LCIP will enable the Government to implement project

Sector
Commercial, Power Generation (CCGT), Government
Location
Mozambique
Updated
22 Jul 2026
Source
African Development Bank (AfDB)

ConstructChat

Ask ConstructChat about Mozambique - Electricity Master Plan Study

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Mozambique - Electricity Master Plan Study” is an infrastructure initiative in the Commercial sector, located in Mozambique. Taiyo aggregates data on it from African Development Bank (AfDB).

Participants

Sponsoring Agency

Status

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The proposed Electricity Master Plan together with the ongoing ‘Rural Electrification Strategic Plan for Mozambique’ study and ‘Mepanda Uncua and Cahora Bassa North Project Feasibility Study’ will provide the Government a comprehensive Least Cost Investment Plan (LCIP) for the power sub-sector in the medium-to-short term. The availability of the LCIP will enable the Government to implement project on rational basis, and mobilise investment capital to advance electrification. The Bank, through the proposed intervention, will therefore assist the Government to put the necessary ground for advancing electrification for socio-economic development. The study will involve (a) technical studies (load forecast, network configuration, load flow and stability analyses, and LDC configuration); (b) crosscutting issues analyses (environmental, poverty reduction and gender mainstreaming), (c) investment and operational cost analyses; (d) institutional and tariff structure analyses, and (e) funding sources analyses. The proposed study will be completed in twelve (12) calendar months with a total cost, net of taxes and duties, is estimated at UA 1.068 million..

Original sector

Energy

Budget

Location

Country

Mozambique

Source

Source

African Development Bank (AfDB)

URL

More Details

Record type

Project

Sector

Commercial, Power Generation (CCGT), Government

Article published date

2025-12-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project