logo

Mozambique - Massingir Dam and Smallholder Agricultural Rehabilitation Project Supplementary Loan

Sector: Raw Materials • Location: Mozambique

Source: African Development Bank (AfDB)

Project

The present project is a supplementary loan to fill the financing gap and provide adequate resources for the implementation of the Massingir Dam Emergency Rehabilitation Project (MDERP). MDERP was appraised in March 2009 as a response to an emergency when the Massingir Dam’s bottom outlets collapsed resulting in the release of an uncontrollable outflow of Water. It is therefore an autonomous opera

Project Information FAQ

Project Information

4 Q
The project “Mozambique - Massingir Dam and Smallholder Agricultural Rehabilitation Project Supplementary Loan” is an infrastructure initiative in the Raw Materials sector, located in Mozambique. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The present project is a supplementary loan to fill the financing gap and provide adequate resources for the implementation of the Massingir Dam Emergency Rehabilitation Project (MDERP). MDERP was appraised in March 2009 as a response to an emergency when the Massingir Dam’s bottom outlets collapsed resulting in the release of an uncontrollable outflow of Water. It is therefore an autonomous operation justified by the need to prevent a disaster in case of severe flood, a phenomenon common in Mozambique. The project implementation commenced in 2010 with the launching of the tender process for the repair of the bottom outlets, but the process proved unsuccessful as it resulted in extremely variable bids (very high and very low). The only substantive bid exceeded the project’s available funds by about USD 37 million. This support aims to complement the resources provided by the ADB loan for the effective implementation of the MDERP. The supplementary Loan not exceeding UA 22.01 million comprises of UA 18.13 million from ADF 12 resources and UA 3.88 million from cancelled resources resulting from closed projects be extended to the Government of Mozambique. It consists of two main components: I) Rehabilitation of the Massingir Dam Bottom Outlet; and II) Project Management, included the Consultancy Services for the supervision of the works.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data