Mozambique - Massingir Dam Emergency Rehabilitation Project (MDERP) - Supplementary Loan
Sector: Raw Materials • Location: Mozambique
Source: African Development Bank (AfDB)
The Massingir Dam Emergency Rehabilitation Project (MDERP) was designed to deal with an emergency situation in Mozambique. Indeed, the dam was in an unstable state, due to the low flow through the spillway while about 1 million people (or 5% of the total population of Mozambique) live in the vicinity of the dam, and their lives, Livelihoods and assets were threatened by a collapse in the event of
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Obfuscated Data |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Massingir Dam Emergency Rehabilitation Project (MDERP) was designed to deal with an emergency situation in Mozambique. Indeed, the dam was in an unstable state, due to the low flow through the spillway while about 1 million people (or 5% of the total population of Mozambique) live in the vicinity of the dam, and their lives, Livelihoods and assets were threatened by a collapse in the event of floods. During its implementation, this project was evaluated in March 2009 following an emergency following the collapse of the Massingir Dam's bottom drain, which resulted in uncontrollable discharge of water. The Mozambican government then sought the support of the African Development Bank Group (AfDB) to remedy this situation. To this end, the AfDB reacted promptly by approving in July 2009 an emergency loan of UA 13.30 million (considered as an additional loan) for the repair of the bottom drain at the total estimated cost of UA 21.4 million, the balance to be borne by the Government of Mozambique. Initially, the project consisted of two main components: (i) component A: Rehabilitation of the Massingir Dam sump; ii) Component B: Project Management. With the additional loan, these components remained the same, while consultant services for the supervision of the works will be integrated into the project management component. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
