logo

Mozambique - Massingir Dam Emergency Rehabilitation Project Supplementary Loan II (MDERP-SLII)

Sector: Raw Materials • Location: Mozambique

Source: African Development Bank (AfDB)

Project

This intervention is the second supplementary loan of the Massingir Dam Emergency Rehabilitation Project (MDERP-SLII) in Mozambique. The initial Massingir Dam Emergency Rehabilitation Project (MDERP) was appraised in March 2009 as a response to an emergency when the Massingir Dam’s bottom outlets collapsed resulting in the release of an uncontrollable outflow of water to downstream areas. A first

Project Information FAQ

Project Information

4 Q
The project “Mozambique - Massingir Dam Emergency Rehabilitation Project Supplementary Loan II (MDERP-SLII)” is an infrastructure initiative in the Raw Materials sector, located in Mozambique. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

This intervention is the second supplementary loan of the Massingir Dam Emergency Rehabilitation Project (MDERP-SLII) in Mozambique. The initial Massingir Dam Emergency Rehabilitation Project (MDERP) was appraised in March 2009 as a response to an emergency when the Massingir Dam’s bottom outlets collapsed resulting in the release of an uncontrollable outflow of water to downstream areas. A first additional lending transaction (MDDEP-SL) was approved in May 2013. Unfortunately, due to financial problems which have been experienced by the Government during implementation of MDERP SL, the Government was unable to provide part of the required financial resources. This has resulted in an outstanding amount of about UA 4.94 million. The Massingir Dam Project is of high economic, environmental and social importance to the country and without the second supplementary loan (MDERP-SL-II) to bridge the shortfall, the Project cannot be fully implemented which will result in exposure of uncompleted structures in Massingir District. The supplementary loan consists of one component, namely Rehabilitation of the Massingir Dam Bottom Outlets with two (2) sub-components (i) Completion of Dam Safety Structures, and (ii) Project Management. The Project cost, including physical and price contingencies, is UA 4.94 million (including taxes and duties).

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data