Mozambique - The 66 Kv Power Evacuation Line from Namaacha Wind Power Project to Boane Substation

Sector: Manufacturing (Industrial) • Location: Mozambique

Source: African Development Bank (AfDB)

Project

The project involves the development of 2 single circuit 66kV (approximately 43km each) climate proofed overhead transmission line and strengthening of the network with compensation equipment to allow the evacuation of power from the 120 MW Namaacha wind farm under development. The wind farm project would be located 11km to the north-west of Namaacha town, close to the borders with South Africa an

Project Information FAQ

Project Information

4 Q
The project “Mozambique - The 66 Kv Power Evacuation Line from Namaacha Wind Power Project to Boane Substation” is an infrastructure initiative in the Manufacturing (Industrial) sector, located in Mozambique. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project involves the development of 2 single circuit 66kV (approximately 43km each) climate proofed overhead transmission line and strengthening of the network with compensation equipment to allow the evacuation of power from the 120 MW Namaacha wind farm under development. The wind farm project would be located 11km to the north-west of Namaacha town, close to the borders with South Africa and Eswatini. The transmission line will run from the Namaacha wind farm project substation and will connect to the 66KV side of the existing Boane 66/33KV substation. The existing Boane 66/33KV substation will be extended to accommodate additional bays for the two new lines and the STATCOM. The Project is packaged into the following main components : (i) Construction of transmission lines, extension of substations, and compensation devices; (ii) Project management and capacity building; (iii) Implementation of the resettlement action plan (RAP), environmental and social management plan (ESMP), livelihood resilience, and gender action plan (GAP). The total cost of the project is estimated at USD 56.06 million [UC 42.07 million].

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data