Mozambique - The 66 Kv Power Evacuation Line from Namaacha Wind Power Project to Boane Substation
Sector: Manufacturing (Industrial) • Location: Mozambique
Source: African Development Bank (AfDB)
The project involves the development of 2 single circuit 66kV (approximately 43km each) climate proofed overhead transmission line and strengthening of the network with compensation equipment to allow the evacuation of power from the 120 MW Namaacha wind farm under development. The wind farm project would be located 11km to the north-west of Namaacha town, close to the borders with South Africa an
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Obfuscated Data |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The project involves the development of 2 single circuit 66kV (approximately 43km each) climate proofed overhead transmission line and strengthening of the network with compensation equipment to allow the evacuation of power from the 120 MW Namaacha wind farm under development. The wind farm project would be located 11km to the north-west of Namaacha town, close to the borders with South Africa and Eswatini. The transmission line will run from the Namaacha wind farm project substation and will connect to the 66KV side of the existing Boane 66/33KV substation. The existing Boane 66/33KV substation will be extended to accommodate additional bays for the two new lines and the STATCOM. The Project is packaged into the following main components : (i) Construction of transmission lines, extension of substations, and compensation devices; (ii) Project management and capacity building; (iii) Implementation of the resettlement action plan (RAP), environmental and social management plan (ESMP), livelihood resilience, and gender action plan (GAP). The total cost of the project is estimated at USD 56.06 million [UC 42.07 million]. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |