Mozambique – Tanzania Interconnector Project
One of 4,322 projects Taiyo tracks in Multinational.
Source: African Development Bank (AfDB)
This operation is a grant not exceeding US$1,995,000 to Southern African Power Pool (SAPP) on behalf of the national power utilities, EDM and TANESCO for the purpose of conducting the pre-investment technical and environmental studies on the Mozambique–Tanzania (MOTA) Interconnector Project. The 400kV Palma (Mozambique)–Mtwara (Tanzania) power transmission line development project to interconnect
- Sector
- Power Generation (CCGT), Government
- Location
- World
- Updated
- 22 Jul 2026
- Source
- African Development Bank (AfDB)
ConstructChat
Ask ConstructChat about Mozambique – Tanzania Interconnector Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This operation is a grant not exceeding US$1,995,000 to Southern African Power Pool (SAPP) on behalf of the national power utilities, EDM and TANESCO for the purpose of conducting the pre-investment technical and environmental studies on the Mozambique–Tanzania (MOTA) Interconnector Project. The 400kV Palma (Mozambique)–Mtwara (Tanzania) power transmission line development project to interconnect the two countries was first initiated by both national power utilities in 2002. The proposed studies for the technical, economic, financial and environmental feasibility studies will include detailed designs for transmission lines, substations and associated infrastructure as well as recommend an appropriate project implementation structure. In addition, the studies will include the development of Tender Documents that will be issued to EPC Contractors through an international competitive bidding process in line with the requirements of international funders and investors. |
Original sector | Energy |
Budget |
Location
Country | World |
Source
Source | African Development Bank (AfDB) |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Government |
Article published date | 2025-12-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in Multinational
- Multinational - The Interconnection of Electric Grids of Nile Equatorial Lakes Countries (Grant to the Republic of Burundi)
- Ghana - Togo - Benin Power Interconnect
- Multinational- Ruzizi III regional hydropower plant project
- Multinational - Scaling-up the Clean Cooking Industry in Africa
- Multinational- Ruzizi III regional hydropower plant project (Rwanda)
- Multinational - Kigali/Bujumbura oil products pipeline feasability study
- Multinational - Uganda – DRC Power Transmission Study
- Multinational - Study on the Cameroon-Chad Electricity Interconnection Project
