Mozambique Backbone Transmission System Project
Sector: Government • Location: Mozambique
Source: European Union Africa Infrastructure Trust Fund
The Backbone project consists in a double transmission line from the Tete Province in Centre Mozambique to the capital Maputo in Southern Mozambique and the Southern African Power Pool (SAPP) interconnected power network. It will transport the electricity generated in new hydro power plants from Mphanda Nkuwa (1 500 MW) and Cahora Bassa (North Bank, 1 245 MW) to the markets. It will comprise of a
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Close |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Backbone project consists in a double transmission line from the Tete Province in Centre Mozambique to the capital Maputo in Southern Mozambique and the Southern African Power Pool (SAPP) interconnected power network. It will transport the electricity generated in new hydro power plants from Mphanda Nkuwa (1 500 MW) and Cahora Bassa (North Bank, 1 245 MW) to the markets. It will comprise of a 400kV HVAC (High voltage alternative) line and a 800 kV HVDC (High voltage direct) line to supply the major consumption zones within Mozambique and link with the South African market. Government of Mozambique has already identified potential financiers for the project, namely: World Bank, as a probable lead partner, NORAD (Norway), SIDA (Swedish International Development Agency), AfDB (African Development Bank), EIB (European Investment Bank), DBSA (Development Bank of South Africa), AFD (France Development Agency), and KFW (Kreditanstalt fur Wiederaufbau). The proposed grant has been used by Electricidade de Moçambique (EDM) to finance a comprehensive Strategic Regional Environmental and Social Assessment (SRESA) in the framework of the Mozambique Backbone Transmission project (STE). The Final Report was delivered in June 2012, but the official presentation took place in 2014. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | Low |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
