logo

Mozambique Backbone Transmission System Project

Sector: Government • Location: Mozambique

Source: European Union Africa Infrastructure Trust Fund

Project
Close

The Backbone project consists in a double transmission line from the Tete Province in Centre Mozambique to the capital Maputo in Southern Mozambique and the Southern African Power Pool (SAPP) interconnected power network. It will transport the electricity generated in new hydro power plants from Mphanda Nkuwa (1 500 MW) and Cahora Bassa (North Bank, 1 245 MW) to the markets. It will comprise of a

Project Information FAQ

Project Information

4 Q
The project “Mozambique Backbone Transmission System Project” is an infrastructure initiative in the Government sector, located in Mozambique. Taiyo aggregates data on it from European Union Africa Infrastructure Trust Fund.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Close

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Backbone project consists in a double transmission line from the Tete Province in Centre Mozambique to the capital Maputo in Southern Mozambique and the Southern African Power Pool (SAPP) interconnected power network. It will transport the electricity generated in new hydro power plants from Mphanda Nkuwa (1 500 MW) and Cahora Bassa (North Bank, 1 245 MW) to the markets. It will comprise of a 400kV HVAC (High voltage alternative) line and a 800 kV HVDC (High voltage direct) line to supply the major consumption zones within Mozambique and link with the South African market. Government of Mozambique has already identified potential financiers for the project, namely: World Bank, as a probable lead partner, NORAD (Norway), SIDA (Swedish International Development Agency), AfDB (African Development Bank), EIB (European Investment Bank), DBSA (Development Bank of South Africa), AFD (France Development Agency), and KFW (Kreditanstalt fur Wiederaufbau). The proposed grant has been used by Electricidade de Moçambique (EDM) to finance a comprehensive Strategic Regional Environmental and Social Assessment (SRESA) in the framework of the Mozambique Backbone Transmission project (STE). The Final Report was delivered in June 2012, but the official presentation took place in 2014.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

Low

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data