logo

Mozambique-Malawi Transmission Interconnector (Mozambique section)

Sector: Commercial • Location: Mozambique

Source: Programme for Infrastructure Development in Africa (PIDA)

Project
Active

The project entails the construction of a 218 km, being 142 km at Mozambique side and 76 km at Malawi side,  400 kV (initially to be operated at 220 kV) power line from Matambo substation, in Mozambique, to Phombeya, north of Malawi's commercial capital, Blantyre. The first assignment will involve the design, supply and installation of the 400 kV overhead transmission line from the Mozambique-

Project Information FAQ

Project Information

5 Q
The project “Mozambique-Malawi Transmission Interconnector (Mozambique section)” is an infrastructure initiative in the Commercial sector, located in Mozambique. Taiyo aggregates data on it from Programme for Infrastructure Development in Africa (PIDA).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project entails the construction of a 218 km, being 142 km at Mozambique side and 76 km at Malawi side,  400 kV (initially to be operated at 220 kV) power line from Matambo substation, in Mozambique, to Phombeya, north of Malawi's commercial capital, Blantyre. The first assignment will involve the design, supply and installation of the 400 kV overhead transmission line from the Mozambique-Malawi border to Phombeya substation including construction of the landing bay at 400kV Phombeya substation related to the Malawian side. The second assignments include extension/ upgrading of Matambo substation form 220 kV to 400 kV and upgrading of SCADA systems (EDM) related to Mozambique side.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

Medium

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data