Mphanda Nkuwa Hydroelectric PPP project
Sector: Power Generation (CCGT) • Location: Mozambique
Source: InfraPPPWorld
The project involves the development of Mphanda Nkuwa hydroelectric plant in Tete Province of Mozambique. It will be located on the Zambezi River, approximately 61 km downstream of the Cahora Bassa Hydroelectric Power Plant. The Mphanda Nkuwa plant will have capacity to produce 1,500 MW. The scope of works also includes the construction of a 1,300 km long transmission line to facilitate electric p
- Status
- Closed
- Sector
- Power Generation (CCGT), Government
- Location
- Mozambique
- Updated
- 22 Jul 2026
- Source
- InfraPPPWorld
ConstructChat
Ask ConstructChat about Mphanda Nkuwa Hydroelectric PPP project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project involves the development of Mphanda Nkuwa hydroelectric plant in Tete Province of Mozambique. It will be located on the Zambezi River, approximately 61 km downstream of the Cahora Bassa Hydroelectric Power Plant. The Mphanda Nkuwa plant will have capacity to produce 1,500 MW. The scope of works also includes the construction of a 1,300 km long transmission line to facilitate electric power transmission from Tete to Maputo. |
Original sector | Energy |
Procurement method | |
Budget |
Location
Country | Mozambique |
Source
Source | InfraPPPWorld |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Government |
Article published date | 2025-02-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
