logo
ProjectClosed

MPP II

One of 3,507 projects Taiyo tracks in Ethiopia.

Source: World Bank Group

The Second Agricultural Minimum Package Project will expand and consolidate the Borrower's agricultural minimum package program over a two-year period. The project has been designed to: (i) increase the productivity and incomes of small farmers by introducing them to fertilizer, improved seeds and other agricultural inputs; (ii) strengthen the institutional and technical framework to progressively

Status
Closed
Sector
Water Supply and Storage, Fertilizers, Raw Materials, Government
Location
Ethiopia
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about MPP II

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “MPP II” is an infrastructure initiative in the Water Supply and Storage sector, located in Ethiopia. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Second Agricultural Minimum Package Project will expand and consolidate the Borrower's agricultural minimum package program over a two-year period. The project has been designed to: (i) increase the productivity and incomes of small farmers by introducing them to fertilizer, improved seeds and other agricultural inputs; (ii) strengthen the institutional and technical framework to progressively expand and improve the minimum package program; and (iii) help to ensure long-term productivity of the land by expanding the Borrower's soil and water conservation efforts. By the end of the project period, an additional 150,000 farm families are expected to be served by the minimum package program. After about thirteen years, an estimated 2.0 million farm families will have benefitted from the program and smallholder foodgrain production is expected to have increased substantially. The project primarily faces risks of delays and of possible reductions in scale. However, in view of the importance and high potential of the project for the mostly very low-income Ethiopian farmers, the risks are considered acceptable.

Original sector

Agriculture, Fishing and Forestry

Location

Country

Ethiopia

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Fertilizers, Raw Materials, Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project