logo

MPP II

Sector: Water Supply and Storage • Location: Ethiopia

Source: World Bank Group

Project
Closed

The Second Agricultural Minimum Package Project will expand and consolidate the Borrower's agricultural minimum package program over a two-year period. The project has been designed to: (i) increase the productivity and incomes of small farmers by introducing them to fertilizer, improved seeds and other agricultural inputs; (ii) strengthen the institutional and technical framework to progressively

Project Information FAQ

Project Information

5 Q
The project “MPP II” is an infrastructure initiative in the Water Supply and Storage sector, located in Ethiopia. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Second Agricultural Minimum Package Project will expand and consolidate the Borrower's agricultural minimum package program over a two-year period. The project has been designed to: (i) increase the productivity and incomes of small farmers by introducing them to fertilizer, improved seeds and other agricultural inputs; (ii) strengthen the institutional and technical framework to progressively expand and improve the minimum package program; and (iii) help to ensure long-term productivity of the land by expanding the Borrower's soil and water conservation efforts. By the end of the project period, an additional 150,000 farm families are expected to be served by the minimum package program. After about thirteen years, an estimated 2.0 million farm families will have benefitted from the program and smallholder foodgrain production is expected to have increased substantially. The project primarily faces risks of delays and of possible reductions in scale. However, in view of the importance and high potential of the project for the mostly very low-income Ethiopian farmers, the risks are considered acceptable.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data