MPP II
One of 3,507 projects Taiyo tracks in Ethiopia.
Source: World Bank Group
The Second Agricultural Minimum Package Project will expand and consolidate the Borrower's agricultural minimum package program over a two-year period. The project has been designed to: (i) increase the productivity and incomes of small farmers by introducing them to fertilizer, improved seeds and other agricultural inputs; (ii) strengthen the institutional and technical framework to progressively
- Status
- Closed
- Sector
- Water Supply and Storage, Fertilizers, Raw Materials, Government
- Location
- Ethiopia
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about MPP II
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Second Agricultural Minimum Package Project will expand and consolidate the Borrower's agricultural minimum package program over a two-year period. The project has been designed to: (i) increase the productivity and incomes of small farmers by introducing them to fertilizer, improved seeds and other agricultural inputs; (ii) strengthen the institutional and technical framework to progressively expand and improve the minimum package program; and (iii) help to ensure long-term productivity of the land by expanding the Borrower's soil and water conservation efforts. By the end of the project period, an additional 150,000 farm families are expected to be served by the minimum package program. After about thirteen years, an estimated 2.0 million farm families will have benefitted from the program and smallholder foodgrain production is expected to have increased substantially. The project primarily faces risks of delays and of possible reductions in scale. However, in view of the importance and high potential of the project for the mostly very low-income Ethiopian farmers, the risks are considered acceptable. |
Original sector | Agriculture, Fishing and Forestry |
Location
Country | Ethiopia |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Fertilizers, Raw Materials, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in Ethiopia
- Gilgel Gibe III Hydroelectric Power Project
- An expansion on producing Bottled water
- Expansion of production facility for Ethiopian spices
- Coffee processing plant
- Expansion project for bottling natural mineral water
- EIC- Children's Clothes
- Production of Envelopes and Paper Bags
- A new project on Iodized Salt production
