MPWS Desalination Plant Infrastructure Design/Build
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
This project scope is the construction of 4.8 MGD (mega/Million gallons:day) (future 6.4mGD) treatment plant that will include a pretreatment system (pressure filters) for raw water, reverse osmosis treatment, post treatment stabilization, UV disinfection, storage and transmission pumpage for treated water.
- Status
- Closed
- Sector
- Water Supply and Storage, Seaport, Waste Processing and Treatment, Commercial
- Location
- Marina, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about MPWS Desalination Plant Infrastructure Design/Build
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | bid results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project scope is the construction of 4.8 MGD (mega/Million gallons:day) (future 6.4mGD) treatment plant that will include a pretreatment system (pressure filters) for raw water, reverse osmosis treatment, post treatment stabilization, UV disinfection, storage and transmission pumpage for treated water. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Marina |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Seaport, Waste Processing and Treatment, Commercial |
Article published date | 2025-09-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
