MPX Taua Energia Solar
Sector: Power Generation (CCGT) • Location: Brazil
Source: World Bank Group
MPX Energia, a subsidiary of EBX Capital Partners [Brazil, 100%] was responsible for the construction and operation of a solar power plant with capacity of 1 MW located at the state of Ceara. This was the first solar power plant to be connected and sell energy to the national grid.
Total project cost was approximately US $6.1 million (BRL 10 million). Construction works commenced in March 2010
- Status
- Prospective
- Sector
- Power Generation (CCGT), Solar, Commercial, Government
- Location
- Brazil
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about MPX Taua Energia Solar
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | MPX Energia, a subsidiary of EBX Capital Partners [Brazil, 100%] was responsible for the construction and operation of a solar power plant with capacity of 1 MW located at the state of Ceara. This was the first solar power plant to be connected and sell energy to the national grid. Total project cost was approximately US $6.1 million (BRL 10 million). Construction works commenced in March 2010 and were 65% complete by December 2010. The project was delayed several times before becoming operational in May 2011. In September 2013, EBX sold part of its ownership in MPX, the subsidiary of EBX Capital Partners responsible for managing the group's energy projects. MPX changed its name to Eneva, and its ownership structure was established as follows: EBX, 20%; the German company E.ON, 42.9%; free float, 37.1%. http://www.iadb.org/en/news/webstories/2011-05-26/solar-power-in-brazils-ceara,9386.html |
Original sector | Energy |
Budget |
Location
Country | Brazil |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Solar, Commercial, Government |
Article published date | 2024-06-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in Brazil
- Belo Monte Hydroelectric Power Plant Xingu River
- Jirau Hydroelectric Power Plant Rondnia
- The Baguari Hydro Power Plant Brazil
- Uruguaiana CCGT Power Plant Brazil
- GNA I LNGtoPower Project Rio de Janeiro Brazil
- Feijo Hybrid Wind and Solar Project Brazil
- Juba-Jauru-Maggi-Nova Mutum Transmission Line
- Potiguar Sul Transmissao de Energia
