MR3: Al Ghabawi Septic Tank Facility
Sector: Road • Location: Jordan
Source: European Bank for Reconstruction and Development (EBRD)
Provision of a sovereign loan for the construction of a new wastewater facility for the disposal of septic tank effluent. 1. Non-Technical Summary (NTS) 2. Stakeholder Engagement Plan 3. Environmental and Social Action Plan (ESAP) 4. Environmental and Social Impact Assessment (ESIA) Download documents in English and Arabic (Zip format) Al Ghabawi Septic Tank Facility Project SEP : English | Arabic
- Status
- Under Construction
- Sector
- Road, Water Supply and Storage, Government, Residential, Waste Processing and Treatment, Commercial
- Location
- Jordan
- Updated
- 22 Jul 2026
- Source
- European Bank for Reconstruction and Development (EBRD)
ConstructChat
Ask ConstructChat about MR3: Al Ghabawi Septic Tank Facility
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | disbursing |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Provision of a sovereign loan for the construction of a new wastewater facility for the disposal of septic tank effluent. 1. Non-Technical Summary (NTS) 2. Stakeholder Engagement Plan 3. Environmental and Social Action Plan (ESAP) 4. Environmental and Social Impact Assessment (ESIA) Download documents in English and Arabic (Zip format) Al Ghabawi Septic Tank Facility Project SEP : English | Arabic Full ESIA documentation is available locally at: Water Authority of Jordan Building No. 6, Jaber Ben Hayyan Street, Shmeisani - Amman Telephone: +962-6-5652261 Uhud District Municipal Directorate / GAM: Al-Khashafieh North District / opposite to Al- Khashafieh Health Center Tel: +962-6-4020410 EBRD Resident Office in Jordan Emmar Towers, 196 Zahran Street, 15th Floor P.O. Box 852805 Amman 11185 Jordan Environmental or social enquiries Water Authority of Jordan Attention. Eng. Ahmad Al-Awamleh Building No. 6, Jaber Ben Hayyan Street, Shmeisani P.O. Box 5012, Amman-11181 Telephone: +961 6-5652261 – Extension (1050) Fax: +961 6-5687760 Email: ahmad_al-awamleh@mwi.gov.jo Web: www.mwi.gov.jo Contact Name: Eng. Sultan Mashaqbah Email: Sultan_Mashaqbah@mwi.gov.jo Web: www.mwi.gov.jo |
Original sector | Municipal Infrastructure |
Budget |
Location
Country | Jordan |
Source
Source | European Bank for Reconstruction and Development (EBRD) |
URL |
More Details
Record type | Project |
Sector | Road, Water Supply and Storage, Government, Residential, Waste Processing and Treatment, Commercial |
Article published date | 2025-07-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
