MREFPP Mouse River Park Bridge Replacement Phase RC-1A
Sector: Manufacturing (Industrial) • Location: Tolley, North Dakota, United States of America
Source: Dodge
In general, the Work includes the labor, materials, tools, and equipment required to construct MREFPP Phase RC-1A: Mouse River Park 95th St NW Bridge Replacement, Prestressed Concrete Beam Fabrication. This includes fabrication of the concrete beams and delivery to the site as fully depicted in the Drawings and Technical Specifications for the Project. The project is located adjacent to Mouse Rive
- Status
- Closed
- Sector
- Manufacturing (Industrial), Bridge, Road, Car parking, Automotive, Commercial, Cement, Government
- Location
- Tolley, North Dakota, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about MREFPP Mouse River Park Bridge Replacement Phase RC-1A
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | In general, the Work includes the labor, materials, tools, and equipment required to construct MREFPP Phase RC-1A: Mouse River Park 95th St NW Bridge Replacement, Prestressed Concrete Beam Fabrication. This includes fabrication of the concrete beams and delivery to the site as fully depicted in the Drawings and Technical Specifications for the Project. The project is located adjacent to Mouse River Park in Renville County, North Dakota. Agency Construction Management Services for Mouse River ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | North Dakota |
City | Tolley |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Bridge, Road, Car parking, Automotive, Commercial, Cement, Government |
Article published date | 2025-07-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- SR 75 FROM SR 2 TO NORTH CAROLINA STATE LINE
- SR 20 FM PRESTON HILLS/LAUREL DR TO CR 715/REYNOLDS RD
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 10 FROM CR 107/NORTH LEG DRIVE TO CR 2485/HALE STREET
- CS 493/INDUSTRIAL BLVD FROM SR 19 TO SR 31 - TIA
- SR 19;SR 23; SR 26 & SR 204 @ 9 LOCS - BRIDGE PRESERVATION
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- West lake sammamish parkway phase 2
