logo
ProjectClosed

MRF Tire Loading Dock Construction

Closed · South Carolina · Last reported Apr 2024

Source: Dodge USA

MRF TIRE LADING DOCK CONSTRUCTION PROJECT, Bid #24-033. The scope includes clearing, grading, filling, paving, concrete, electrical features, stormwater controls and sediment control.

Status
Closed
Sector
Commercial, Water Supply and Storage, Cement, Power Generation (CCGT), Waste Processing and Treatment, Government
Location
Belton, South Carolina, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about MRF Tire Loading Dock Construction

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “MRF Tire Loading Dock Construction” is an infrastructure initiative in the Commercial sector, located in Belton, South Carolina, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

MRF TIRE LADING DOCK CONSTRUCTION PROJECT, Bid #24-033. The scope includes clearing, grading, filling, paving, concrete, electrical features, stormwater controls and sediment control.

Procurement method

Budget

Location

Country

United States of America (USA)

State

South Carolina

City

Belton

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Commercial, Water Supply and Storage, Cement, Power Generation (CCGT), Waste Processing and Treatment, Government

Article published date

2024-04-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project