logo

MRS Logistica SA

Sector: Metal • Location: Brazil

Source: World Bank Group

Project
Active

In September 1996, MRS Logistica won a 30-year concession to rehabilitate and operate the 1,674 km southeastern railway network. In 1995, the Brazilian government decided to divide the national railway, RFFSA, into six exclusive regional systems and to offer a 30-year concession contract for each system. This is one of the six concessions that were awarded between March 1996 and July 1997. Concess

Status
Prospective
Sector
Metal, Government, Rail, Steel, Mass Transit, Manufacturing (Industrial)
Location
Brazil
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about MRS Logistica SA

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “MRS Logistica SA” is an infrastructure initiative in the Metal sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

In September 1996, MRS Logistica won a 30-year concession to rehabilitate and operate the 1,674 km southeastern railway network. In 1995, the Brazilian government decided to divide the national railway, RFFSA, into six exclusive regional systems and to offer a 30-year concession contract for each system. This is one of the six concessions that were awarded between March 1996 and July 1997. Concessions were awarded on the basis of the highest bid above the government's minimum price. Concessionaires paid an upfront lump sum, and a stream of pre-determined payments over the life of the concession. Unlike in Argentina, concessionaires have no control over initial employment decisions. The winning consortium, MRS Logistica, comprised: Cia Siderurgica Nacional and Usinas, Brazil's largest two steel mills; Mineracoes Reunidas Brasileiras and Ferteco, two major Brazilian iron ore producers; and Cia Siderurgica da Guanabara. MRS Logistica paid R$888.9 million (approximately US$ 855 million) for the concession. It plans to invest R$100 million in 1997, and another R$100 in 1998. Financing for this investment was raised through eurobonds placed on the market in 1997. The operators were planning to expand the network's freight capacity by 50% by 2001. As of December 2003, MRS Logistica was controlled by Companhia Siderurgica Nacional (32.2%), Mineracao Brasileira Reunidas (31.6%), Companhia Vale do Rio Doce (10.3%), Usinas Siderurgicas de Minas Gerais (10.1%), and Ultrafertil SA (3.5%). As of March 2009, the shareholding structure was: MBR held 32.93% of the shares; CSN held 22.93%; Vale held 10.89%; Usiminas held 11.13%; Gerdau held 1.31%; and other investores held 20.79%. In 2008, the total investment in rolling stock and infrastructure added up to US$ 570.7 million (BRL 1044.4 million). A total of US$ 274.5 million (BRL 549 million) was invested in 2009 (US$ 89 million - BRL 178 million - in rolling stock; US$ 110.5 million - BRL 221 million - in infrastructure; US$ 56 million - BRL 112 million - in signalling, energy and telecomunication; and US$ 19 million - BRL 38 million - in other expenditures). In 2014, the state-owned BNDES approved two loans to the company finance acquisition of rolling stock and the modernizadion of the network: US$ 48.8 million (BRL 114.6 million) in February and US$ 46 million (BRL 108.2 million) in November. The company invested US$ 42 million in 1999 and US$ 60.2 million in 2000. In the following two years, 2001 and 2002, the company investments in its facilities amounted US$ 35.9 million (R$ 79.9 million) and US$ 20.4 million (R$ 72 million) respectively. In 2003, the company invested US$41.6 million (R$ 124.8 million).

Original sector

Transport

Procurement method

Budget

Location

Country

Brazil

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Metal, Government, Rail, Steel, Mass Transit, Manufacturing (Industrial)

Article published date

2024-05-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project