logo

MRUD Storm Sewer Phase 2 Rehabilitation

Sector: Water Supply and Storage • Location: Houston, Texas, United States of America

Source: Dodge

Project
Closed

Removing and replacing existing 24-inch CMP interceptor structures with 24-inch HDPE interceptor structures. The implementation, maintenance, and removal of a stormwater pollution prevention plan to protect the existing Lakewood Grove and Lakewood Forest Detention ponds. Site restoration of all areas disturbed by construction, including removing and replacing damaged concrete, repair of existing s

Status
Closed
Sector
Water Supply and Storage, Cement, Government, Road, Car parking, Waste Processing and Treatment, Automotive, Commercial
Location
Houston, Texas, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about MRUD Storm Sewer Phase 2 Rehabilitation

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “MRUD Storm Sewer Phase 2 Rehabilitation” is an infrastructure initiative in the Water Supply and Storage sector, located in Houston, Texas, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Removing and replacing existing 24-inch CMP interceptor structures with 24-inch HDPE interceptor structures. The implementation, maintenance, and removal of a stormwater pollution prevention plan to protect the existing Lakewood Grove and Lakewood Forest Detention ponds. Site restoration of all areas disturbed by construction, including removing and replacing damaged concrete, repair of existing slope paving and pilot channel, crushed granite trail, asphalt trail, turf, plants, shrubs, fences...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Texas

City

Houston

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Cement, Government, Road, Car parking, Waste Processing and Treatment, Automotive, Commercial

Article published date

2025-08-18

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project