MS/DOT: US 72 Improvements
Planning schematics · Mississippi · Last reported Jan 2025
Source: Dodge
US 72 Improvements, Marshall County US 72 Improvements project that will provide safe and efficient access to the Chickasaw Industrial Park, and specifically the planned eIectric vehicIe battery plant, from both US 72 and SR 302 in Marshall County
- Status
- Prospective
- Sector
- Energy Storage, Commercial, Car parking, Automotive, Manufacturing (Industrial)
- Location
- Holly Springs, Mississippi, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about MS/DOT: US 72 Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | US 72 Improvements, Marshall County US 72 Improvements project that will provide safe and efficient access to the Chickasaw Industrial Park, and specifically the planned eIectric vehicIe battery plant, from both US 72 and SR 302 in Marshall County |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Mississippi |
City | Holly Springs |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Energy Storage, Commercial, Car parking, Automotive, Manufacturing (Industrial) |
Article published date | 2025-02-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Energy Storage projects in United States of America
- INSTALL ROOF MOUNTED SOLAR PV SYSTEM 14 KW 35 MODULES AND 1 BATTERY 13.5 KWH ESS
- INSTALL (141) TESLA SOLAR ROOF TILES AT 10.152 KW TOTAL. INS TALL (13.5) KWH ENERGY STORAGE SYSTEM AND (N) LOAD CENTER
- 10' SUSPENDED WIRE PERIMETER SECRURITY SYSTEM INSIDE FENCE, BATTERY OPERATED LOW VOLTAGE
- INSTALL ROOF MOUNTED SOLAR PV SYSTEM 4.32 KW 12 MODULES AND INSTALL BACK-UP BATTERY 10.5 KWH, EQUIP. ON ENGINEERED FENCE
- INSTALL ROOF MOUNTED SOLAR PV SYSTEM 4.2 KW 12 MODULES 1 LG CHEM BATTERY 9.5 KWH
- REMOVE & REPLACE ANTENNAS, RRUS, BATTERY UNIT
- INSTALL ROOF MOUNTED SOLAR PV SYSTEM 10.8 KW 27 PANELS 1 NEW TESLA BATTERY NEW 100 AMP SOLAR PANEL
- PHASE 3-DATA CENTER- ENCOMPASSING OF PART OF 3RD FLOOR AHU ELECTRICAL ROOM,BATTERY ROOM,INSALL GENERATORS&EQUIP IN YARD
