MSEDCL Off-Grid Solar Pump Supply Project
Sector: Power Generation (CCGT) • Location: Maharashtra, India
Source: Energetica India Magazine
Supply and installation of 6,580 off-grid solar photovoltaic water pumping systems across Maharashtra under the Magel Tyala Saur Krushi Pump Yojana. The project includes design, manufacturing, supply, transportation, installation, testing, and commissioning of solar pumps with capacities of 3 HP, 5 HP, and 7.5 HP.
- Status
- Closed
- Sector
- Power Generation (CCGT), Solar, Water Supply and Storage, Manufacturing (Industrial)
- Location
- Maharashtra, India
- Updated
- 22 Jul 2026
- Source
- Energetica India Magazine
ConstructChat
Ask ConstructChat about MSEDCL Off-Grid Solar Pump Supply Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | awarded |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Supply and installation of 6,580 off-grid solar photovoltaic water pumping systems across Maharashtra under the Magel Tyala Saur Krushi Pump Yojana. The project includes design, manufacturing, supply, transportation, installation, testing, and commissioning of solar pumps with capacities of 3 HP, 5 HP, and 7.5 HP. |
Original sector | Energy |
Budget |
Location
Country | India |
State | Maharashtra |
Source
Source | Energetica India Magazine |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Solar, Water Supply and Storage, Manufacturing (Industrial) |
Article published date | 2026-05-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
