logo
ProjectCompleted

MSETCL

The status, timeline and source of this project. A free account opens every field.

Source: International Finance Corporation (IFC)

MSETCL is a power transmission utility 100% owned by the Government of Maharashtra (GoM). The former vertically integrated Maharashtra State Electricity Board (MSEB) was unbundled in 2005 to create three separate companies focusing on transmission, distribution, and generation. MSETCL operates the largest state-level transmission network in India comprising over 36,286 ckt-kms of transmission lin

Status
Closed
Sector
Water Supply and Storage, Power Generation (CCGT), Fertilizers, Power Transmission, Government
Location
India
Updated
22 Jul 2026
Source
International Finance Corporation (IFC)

ConstructChat

Ask ConstructChat about MSETCL

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “MSETCL” is an infrastructure initiative in the Water Supply and Storage sector, located in India. Taiyo aggregates data on it from International Finance Corporation (IFC).

Participants

Sponsoring Agency

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

MSETCL is a power transmission utility 100% owned by the Government of Maharashtra (GoM). The former vertically integrated Maharashtra State Electricity Board (MSEB) was unbundled in 2005 to create three separate companies focusing on transmission, distribution, and generation. MSETCL operates the largest state-level transmission network in India comprising over 36,286 ckt-kms of transmission lines and 498 substations. Its network spans voltage levels from 500 kV to 66 kV. MSETCL’s system availability is 98.9% and transmission loss is 4.67%. Substantial capital investments are required to improve performance of existing infrastructure while increasing capacity to handle the power expected from new generation projects. MSETCL has prepared a 5 year capital expenditure program (“Project”), which focuses on: (a) rehabilitation of its existing network to reach and maintain high network efficiency; and (b) evacuation lines for new generation capacities in the state. IFC is considering a corporate debt to MSETCL to part finance its 5 year capital expenditure program.

Original sector

DA - Electric Power Transmission

Location

Country

India

Source

Source

International Finance Corporation (IFC)

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Power Generation (CCGT), Fertilizers, Power Transmission, Government

Article published date

2026-01-18

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project