logo
ProjectActive

Msimbazi Basin Development Project

Sector: Water Supply and Storage • Location: Tanzania

Source: World Bank Group

The development objective of the Msimbazi Basin Development Project for Tanzania is to strengthen flood resilience and integrated urban development in an economically important and flood prone area of the Msimbazi river basin in Dar es Salaam. The project comprises of five components. The first component, Msimbazi river basin development infrastructure provides an integrated, long-term solution to

Status
Prospective
Sector
Water Supply and Storage, Bridge, Road, Biomass, Forest Products and Packaging, Commercial, Waste Processing and Treatment, Government, Residential
Location
Tanzania
Updated
19 Nov 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Msimbazi Basin Development Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Msimbazi Basin Development Project” is an infrastructure initiative in the Water Supply and Storage sector, located in Tanzania. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

The development objective of the Msimbazi Basin Development Project for Tanzania is to strengthen flood resilience and integrated urban development in an economically important and flood prone area of the Msimbazi river basin in Dar es Salaam. The project comprises of five components. The first component, Msimbazi river basin development infrastructure provides an integrated, long-term solution to substantially reduce the impacts of floods in the lower Msimbazi river basin that will improve hydraulic capacity of the river, provide an area for flood water detention, build resiliency of key transport infrastructure, regenerate valuable land assets to control encroachment in flood prone areas and allow for public recreation and urban development, and reduce degradation of the Msimbazi watershed. It consists of following sub-components: (i) flood control interventions; (ii) resilient transport infrastructure; (iii) msimbazi city park and redevelopment area; and (iv) watershed management through greening, erosion control, and litter management. The second component, preventative resettlement will finance, the preventive resettlement of low-income flood-prone communities in the lower Msimbazi river basin and project-related displaced persons in compliance with the World Bank environmental and social framework (ESF). It consists of following sub-components: (i) resettlement compensation; and (ii) livelihood restoration. The third component, strengthening institutions for resilient urban development focuses on governance reforms, strengthening new and existing institutions, building capacity, and facilitating coordination for management of the Msimbazi river basin, including the investments and assets created under the project, the surrounding urban area, and the watershed. It consists of following sub-components: (i) Msimbazi special planning area (MSPA) institutional strengthening; (ii) Msimbazi river basin management institutional strengthening; and (iii) local government authorities institutional strengthening. The fourth component, project management will finance the direct costs of management and operation of the project to ensure smooth delivery and compliance with World Bank policy and guidelines. The fifth component, contingent emergency response finance, inter alia provision of immediate response to an eligible crisis or emergency, as needed. This component enables rapid response to eligible emergencies and disasters caused by natural and man-made events by providing contingent financing.

Original sector

FY17 - Public Administration,FY17 - Transportation

Budget

Location

Country

Tanzania

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Bridge, Road, Biomass, Forest Products and Packaging, Commercial, Waste Processing and Treatment, Government, Residential

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project