Msimbazi Basin Development Project
Sector: Water Supply and Storage • Location: Tanzania
Source: World Bank
The development objective of the Msimbazi Basin Development Project for Tanzania is to strengthen flood resilience and integrated urban development in an economically important and flood prone area of the Msimbazi river basin in Dar es Salaam. The project comprises of five components. The first component, Msimbazi river basin development infrastructure provides an integrated, long-term solution to
- Status
- Prospective
- Sector
- Water Supply and Storage, Bridge, Road, Biomass, Forest Products and Packaging, Commercial, Waste Processing and Treatment, Government, Residential
- Location
- Tanzania
- Updated
- 22 Jul 2026
- Source
- World Bank
ConstructChat
Ask ConstructChat about Msimbazi Basin Development Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The development objective of the Msimbazi Basin Development Project for Tanzania is to strengthen flood resilience and integrated urban development in an economically important and flood prone area of the Msimbazi river basin in Dar es Salaam. The project comprises of five components. The first component, Msimbazi river basin development infrastructure provides an integrated, long-term solution to substantially reduce the impacts of floods in the lower Msimbazi river basin that will improve hydraulic capacity of the river, provide an area for flood water detention, build resiliency of key transport infrastructure, regenerate valuable land assets to control encroachment in flood prone areas and allow for public recreation and urban development, and reduce degradation of the Msimbazi watershed. It consists of following sub-components: (i) flood control interventions; (ii) resilient transport infrastructure; (iii) msimbazi city park and redevelopment area; and (iv) watershed management through greening, erosion control, and litter management. The second component, preventative resettlement will finance, the preventive resettlement of low-income flood-prone communities in the lower Msimbazi river basin and project-related displaced persons in compliance with the World Bank environmental and social framework (ESF). It consists of following sub-components: (i) resettlement compensation; and (ii) livelihood restoration. The third component, strengthening institutions for resilient urban development focuses on governance reforms, strengthening new and existing institutions, building capacity, and facilitating coordination for management of the Msimbazi river basin, including the investments and assets created under the project, the surrounding urban area, and the watershed. It consists of following sub-components: (i) Msimbazi special planning area (MSPA) institutional strengthening; (ii) Msimbazi river basin management institutional strengthening; and (iii) local government authorities institutional strengthening. The fourth component, project management will finance the direct costs of management and operation of the project to ensure smooth delivery and compliance with World Bank policy and guidelines. The fifth component, contingent emergency response finance, inter alia provision of immediate response to an eligible crisis or emergency, as needed. This component enables rapid response to eligible emergencies and disasters caused by natural and man-made events by providing contingent financing. |
Original sector | FY17 - Public Administration,FY17 - Transportation |
Budget |
Location
Country | Tanzania |
Source
Source | World Bank |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Bridge, Road, Biomass, Forest Products and Packaging, Commercial, Waste Processing and Treatment, Government, Residential |
Article published date | 2025-12-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in Tanzania
- Open for FDI through a minority stake/Development of a new project/Processing and preserving of fish and fish products/BLUE PROCESSING COMPANY .LTD
- Open for FDI through a minority stake/Establishment of an additional production facility/Manufacture of plastics products/Jafnob Printing and Packaging Ltd
- Open for FDI through a minority stake/Purchase of new machinery and equipment/Manufacture of soap and detergents, cleaning and polishing preparations, perfumes and toilet preparations/NCG CHEMICAL INDUSTRIES
- Dar es Salaam Water Distribution
- Kahama Mining Corp. Ltd.
- Tabora Water Supply Scheme, Tanzania
- Lower Kihansi Hydropower Dam and Reservoir Project
- Open for FDI through a majority stake/Establishment of storage or distribution/sales outlet/Manufacture of tanks, reservoirs and containers of metal/EDCOM LIMITED
