MSL7 Office Relocation
Closed · Washington · Last reported Sep 2025
Source: Dodge
Work consists of providing modular office space at the Sequim campus uplands and shoreline campuses. The Uplands location (MSL5) will site 2ea modular offices with required utilities for occupancy. The Shoreline location (MSL1) will site 1ea modular office with required utilities for occupancy. Utilities will consist of, but not limited to: excavating, concrete, paving, building, painting, electri
- Status
- Closed
- Sector
- Manufacturing (Industrial), Power Generation (CCGT), Power Transmission, Cement, Government, Residential, Commercial
- Location
- Sequim, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about MSL7 Office Relocation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Work consists of providing modular office space at the Sequim campus uplands and shoreline campuses. The Uplands location (MSL5) will site 2ea modular offices with required utilities for occupancy. The Shoreline location (MSL1) will site 1ea modular office with required utilities for occupancy. Utilities will consist of, but not limited to: excavating, concrete, paving, building, painting, electrical, plumbing, communications, fire suppression and alarm all as emulated in the design and speci... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Sequim |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Power Generation (CCGT), Power Transmission, Cement, Government, Residential, Commercial |
Article published date | 2025-09-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- SR 75 FROM SR 2 TO NORTH CAROLINA STATE LINE
- SR 20 FM PRESTON HILLS/LAUREL DR TO CR 715/REYNOLDS RD
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 10 FROM CR 107/NORTH LEG DRIVE TO CR 2485/HALE STREET
- CS 493/INDUSTRIAL BLVD FROM SR 19 TO SR 31 - TIA
- SR 19;SR 23; SR 26 & SR 204 @ 9 LOCS - BRIDGE PRESERVATION
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- West lake sammamish parkway phase 2
