MSU Facilities ReLocation Project BP5
Sector: Metal • Location: Bozeman, Montana, United States of America
Source: Dodge USA
Trades Bldg 29,588 sq ft - Eqpt Garage 8878 Sq Ft Earthwork, sitework, utilities, fencing, landscape and irrigation, concrete footings and foundations, concrete slab on grade, PEMB and metal wall and roof panels (already contracted), cabinets and casework, gutters and downspouts, aluminum windows, aluminum storefront, hollow metal doors and frames, overhead doors, steel stud framing, insulation, g
- Status
- Closed
- Sector
- Metal, Water Supply and Storage, Cement, Education, Power Transmission, Steel, Car parking, Automotive, Commercial, Power Generation (CCGT), Manufacturing (Industrial)
- Location
- Bozeman, Montana, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about MSU Facilities ReLocation Project BP5
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Trades Bldg 29,588 sq ft - Eqpt Garage 8878 Sq Ft Earthwork, sitework, utilities, fencing, landscape and irrigation, concrete footings and foundations, concrete slab on grade, PEMB and metal wall and roof panels (already contracted), cabinets and casework, gutters and downspouts, aluminum windows, aluminum storefront, hollow metal doors and frames, overhead doors, steel stud framing, insulation, gypsum board assemblies, interior finishes, mechanical systems, plumbing system, fire suppression ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Montana |
City | Bozeman |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Metal, Water Supply and Storage, Cement, Education, Power Transmission, Steel, Car parking, Automotive, Commercial, Power Generation (CCGT), Manufacturing (Industrial) |
Article published date | 2024-06-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Metal projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- NEW 3200 SF PREFAB METAL BUILDING CONSISTING OF A CUSTOMER INTERFACE, OFFICES, RESTROOM/BREAK ROOM, DISASSEMBLY & STOR.
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- REPLACE DAMAGED STEEL COLUMN
