M.S.U Northern Gulf Aquatic Food Research Center - Phase 1
Sector: Power Transmission • Location: Mississippi State, Mississippi, United States of America
Source: Dodge USA
Scope - The project consists of sitework, site utility distribution, paving and 10,200 sq ft single story building serving as administrative offices and research laboratory for freshwater and saltwater food products. Building is concrete slab on grade with PEMB structure, metal stud walls, brick veneer and standing seam metal roof. HVAC, plumbing and electrical services are included as well as lab
- Status
- Closed
- Sector
- Power Transmission, Cement, Metal, Education, Residential, Commercial, Power Generation (CCGT), Consumer Products, Raw Materials
- Location
- Mississippi State, Mississippi, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about M.S.U Northern Gulf Aquatic Food Research Center - Phase 1
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Scope - The project consists of sitework, site utility distribution, paving and 10,200 sq ft single story building serving as administrative offices and research laboratory for freshwater and saltwater food products. Building is concrete slab on grade with PEMB structure, metal stud walls, brick veneer and standing seam metal roof. HVAC, plumbing and electrical services are included as well as laboratory casework and fume hoods. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Mississippi |
City | Mississippi State |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Transmission, Cement, Metal, Education, Residential, Commercial, Power Generation (CCGT), Consumer Products, Raw Materials |
Article published date | 2024-08-12 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Transmission projects in United States of America
- FY 2018-JENKINS COUNTY-SEC.5311-OPERATIONS ONLY
- N CENTRAL AVE PEDESTRIAN &TRANSIT IMPROVEMENT STUDY-PHASE II
- MHA Nation Tribal Broadband Project
- Lower Elwha Klallam Tribe Tribal Broadband Connectivity Program
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- North Creek Trail Section 4-Phase 2 & 3
- Fine Arts and Housing Cooling Engineering Study
