MT FLAP BOR 2980-1 Sun River Bridge Replace
Bid results · Montana · Last reported Nov 2024
Source: Dodge USA
The work consists of building a new bridge about 200 feet downstream of the existing bridge, with new approach. The approaches are on embankments and MSE wall approaches. Final surfacing will be gravel for approaches and concrete on the bridge. The project includes construction of a 3 span, 462-foot long precast-post-tensioned girder bridge with a precast concrete deck. Abutments are founded on bo
- Status
- Closed
- Sector
- Bridge, Road, Commercial, Cement
- Location
- Augusta, Montana, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about MT FLAP BOR 2980-1 Sun River Bridge Replace
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work consists of building a new bridge about 200 feet downstream of the existing bridge, with new approach. The approaches are on embankments and MSE wall approaches. Final surfacing will be gravel for approaches and concrete on the bridge. The project includes construction of a 3 span, 462-foot long precast-post-tensioned girder bridge with a precast concrete deck. Abutments are founded on both spread footing and piles within an MSE wall fill. Piers are supported on 10 foot diameter dril... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Montana |
City | Augusta |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Bridge, Road, Commercial, Cement |
Article published date | 2024-12-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Bridge projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- I-95 NB @ ST MARYS RIVER - BRIDGE REHAB
- CR 111/ CAIN CREEK RD--CULVERT & APPR @ CROOKED CREEK TRIB
- JOINT REHABILITATION PROJECT ON 12 BRIDGES IN DIST 5|511440
- SR 112 BRIDGE OVER BOLLINGER CREEK| IMPROVE CR 77 FOR DETOUR
- CR 243/BROOKS ROAD @ ALCOVY RIVER
- I-185 @ SR 116; MOUNTAIN OAK CREEK & HOPEWELL CHURCH RD
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
