MT VERNON HWY @ 4 LOCS & PEACHTREE DUNWOODY RD @ 2 LOCS
One of 10,000+ projects Taiyo tracks in Georgia.
Source: Georgia Department of Transportation (GDOT)
This project is a safety and operational improvement project in Fulton County. The proposed project will upgrade six intersections and is located along and adjacent to Mt. Vernon Rd. Intersection upgrades include the addition of sidewalks and high visibility crosswalks, addition of Americans with Disabilities Act ramps and hardscapes, and modifying sizes of raised islands to allow for proper cro
- Status
- Closed
- Sector
- Broadband, Car parking, Road, Telecommunications, Government, Automotive, Manufacturing (Industrial)
- Location
- Atlanta, Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Georgia Department of Transportation (GDOT)
ConstructChat
Ask ConstructChat about MT VERNON HWY @ 4 LOCS & PEACHTREE DUNWOODY RD @ 2 LOCS
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | complete |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project is a safety and operational improvement project in Fulton County. The proposed project will upgrade six intersections and is located along and adjacent to Mt. Vernon Rd. Intersection upgrades include the addition of sidewalks and high visibility crosswalks, addition of Americans with Disabilities Act ramps and hardscapes, and modifying sizes of raised islands to allow for proper crosswalk installation. Intersection approaches will be milled and overlaid. The installation will include decorative mast arm poles with luminaries and illuminated street name signs. Pedestrian lighting will be added throughout the entire project. The intersection signals and traffic control will be upgraded at each intersection. Fiber Optic cables will be installed along the corridor. |
Location
Country | United States of America (USA) |
State | Georgia |
City | Atlanta |
Source
Source | Georgia Department of Transportation (GDOT) |
URL |
More Details
Record type | Project |
Sector | Broadband, Car parking, Road, Telecommunications, Government, Automotive, Manufacturing (Industrial) |
Article published date | 2024-04-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Broadband projects in United States of America
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- UPGRADE (E) WIRELESS TELECOMMUNICATIONS FACILITY.ADD 2 ANTENNAS ADD 3 RRU'S ADD 1 OVP SURGE PROTECTOR ADD 1 HYBRID
- INSTALLATION OF A NEW SMALL CELL WIRELESS FACILITY IN THE PUBLIC RIGHT OF WAY
- REMOVE AND REPLACE NEW WIRELESS ANTENNAS AND RELATED EQUIPMENT
- DISH WIRELESS COLLOCATION ONTO EXISTING WIRELESS FACILITY AND GROUND BASE STATION
- MODIFY EXISTING WIRELESS FACILITY, REMOVE (2) TMA'S, INSTALL (1) RRU , REMOVE (2) DIPLEXERS & UTILITY STANDS, REMOVE (2)
- TEMPORARY USE FOR TEMPORARY FACILITY - CELL SITE ON WHEELS (COW) FOR VERIZON WIRELESS - 67-FEET TALL
- DISH WIRELESS WILL BE PERFORMING A 1ST TIME INSTALL AT AN EX ISTING COMM FACILITY. ADDING 3 ANTENNA AND 6 RRU TO TOP OF T
