logo

MT/DOT : Bridge Rehabilitation & plant mix overlay (CO 202)

Sector: Bridge • Location: Montana, United States of America

Source: Dodge USA

Project
Closed

This rehabilitation project on MT Hwy 37 in Lincoln County begins at the bridge over Sutton Creek, 3 miles north of Peck Gulch Campground (RP 48.6). The project extends 12.4 miles north to just past the intersection of (P-33) MT Hwy 37 and Salmon Drive in Rexford (RP 61.0). The work includes pulverizing the existing road surface and placing a new plant mix overlay surface with a chip seal. Additio

Status
Closed
Sector
Bridge, Road, Mass Transit, Rail, Commercial, Manufacturing (Industrial)
Location
Montana, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about MT/DOT : Bridge Rehabilitation & plant mix overlay (CO 202)

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “MT/DOT : Bridge Rehabilitation & plant mix overlay (CO 202)” is an infrastructure initiative in the Bridge sector, located in Montana, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This rehabilitation project on MT Hwy 37 in Lincoln County begins at the bridge over Sutton Creek, 3 miles north of Peck Gulch Campground (RP 48.6). The project extends 12.4 miles north to just past the intersection of (P-33) MT Hwy 37 and Salmon Drive in Rexford (RP 61.0). The work includes pulverizing the existing road surface and placing a new plant mix overlay surface with a chip seal. Additional work includes new signing and pavement markings, new guardrail, and rumble strips.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Montana

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Bridge, Road, Mass Transit, Rail, Commercial, Manufacturing (Industrial)

Article published date

2024-04-29

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project