logo
Project

Muara Laboh Geothermal Power Project

Sector: Geothermal • Location: Indonesia

Source: Asian Development Bank (ADB)

The project will develop geothermal steam resources through production and injection facilities in the Liki Pinangawan Muaralaboh concession area and construct, operate, and maintain a single power generation unit with a total capacity of approximately 80 megawatts (MW). The concession is located in the South Solok Regency, 150 kilometers (km) southeast of Padang, West Sumatra. The project will be

Sector
Geothermal, Government, Power Generation (CCGT)
Location
Indonesia
Updated
22 Jul 2026
Source
Asian Development Bank (ADB)

ConstructChat

Ask ConstructChat about Muara Laboh Geothermal Power Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Muara Laboh Geothermal Power Project” is an infrastructure initiative in the Geothermal sector, located in Indonesia. Taiyo aggregates data on it from Asian Development Bank (ADB).

Participants

Sponsoring Agency

Company

Status

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project will develop geothermal steam resources through production and injection facilities in the Liki Pinangawan Muaralaboh concession area and construct, operate, and maintain a single power generation unit with a total capacity of approximately 80 megawatts (MW). The concession is located in the South Solok Regency, 150 kilometers (km) southeast of Padang, West Sumatra. The project will be developed and implemented under a 30-year power purchase agreement (PPA) with PLN (the off-taker) and a 20-year support from the Ministry of Finance, as stipulated under a business viability guarantee letter (BVGL). It is intended for base load operation. PLN will build 80 km of transmission lines from the plant site to two 150 kilovolt (kV) substations near Muara Laboh and Sungai Rumbai. The substations will connect power from the generation unit to the Sumatra grid through an existing 275 kV transmission line.

Original sector

Energy

Procurement method

Budget

Location

Country

Indonesia

Source

Source

Asian Development Bank (ADB)

URL

More Details

Record type

Project

Sector

Geothermal, Government, Power Generation (CCGT)

Article published date

2025-07-29

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project