Muchea Battery Project
The owner, status and timeline of this project. A free account opens every field.
Source: ESS News
The Muchea battery project is a 164 MW / 905 MWh grid-scale battery being constructed near the town of Muchea, Western Australia. It is the state's first six-hour duration battery and will include 252 Tesla Megapack 2XL units connected to Western Power's existing Muchea substation. The project aims to deliver grid stability and support the energy transition to renewables in Western Australia.
- Status
- Under Construction
- Sector
- Energy Storage
- Location
- Muchea, Western Australia, Australia
- Updated
- 22 Jul 2026
- Source
- ESS News
ConstructChat
Ask ConstructChat about Muchea Battery Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Muchea battery project is a 164 MW / 905 MWh grid-scale battery being constructed near the town of Muchea, Western Australia. It is the state's first six-hour duration battery and will include 252 Tesla Megapack 2XL units connected to Western Power's existing Muchea substation. The project aims to deliver grid stability and support the energy transition to renewables in Western Australia. |
Original sector | Energy Storage |
Location
Country | Australia |
State | Western Australia |
City | Muchea |
Source
Source | ESS News |
URL |
More Details
Record type | Project |
Sector | Energy Storage |
Article published date | 2026-04-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
