logo
ProjectClosed

Muda Building Weefor / NNArq

Closed · Brazil · Last reported Sep 2023

Source: ArchDaily

On the roof deck, the landscaping proposed an installation using the glass insulators from the old deactivated substation, a small reminder of the activity that once existed there.About the organization of the common areas,  the garage floor is partially excavated, creating an interior garden that offers a feeling of bright, open space. On the first floor, the elevator access has a small library f

Status
Closed
Sector
Road, Education, Cement, Manufacturing (Industrial), Water Supply and Storage, Car parking, Residential, Commercial, Automotive
Location
Brazil
Updated
22 Jul 2026
Source
ArchDaily

ConstructChat

Ask ConstructChat about Muda Building Weefor / NNArq

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Muda Building Weefor / NNArq” is an infrastructure initiative in the Road sector, located in Brazil. Taiyo aggregates data on it from ArchDaily.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

On the roof deck, the landscaping proposed an installation using the glass insulators from the old deactivated substation, a small reminder of the activity that once existed there.About the organization of the common areas,  the garage floor is partially excavated, creating an interior garden that offers a feeling of bright, open space. On the first floor, the elevator access has a small library focused on urbanism and architecture and also houses a co-working space, strategically positioned at the crossroads, thus integrating work activities into the daily life of the neighborhood and facilitating access for employees and visitors.The developer who acquired the land proposed a nationwide competition to select the architectural solution for its first development. This innovative approach in the Brazilian real estate market aimed to broaden the options evaluated and guarantee the architectural quality of the project. Given that the site is located on a corner in a picturesque, tree-lined neighborhood, the solution chosen sought to open up all the units to the street. In this way, the neighborhood is integrated into the private life of the units and, conversely, the different situations of each unit enliven the urban landscape, enriching it with diversity.The 52 units, ranging from 1, 2, and 3 bedrooms, have private programs arranged in strips parallel to the streets (balconies, long-term living spaces, and short-term living spaces), providing considerable internal flexibility. Due to the non-orthogonality of the corner, the units have slight variations in layout and adaptations to the developer's request, also resulting in some volumetric variations on the façade facing Rua Pará.An essential part of the building's relationship with its surroundings is the landscaping, which on the ground floor features dense tree planting, mainly with native species. This vegetation softens the connection between the private areas and their surroundings, especially on the lower floors, preserving the presence of greenery in the neighborhood, a common feature in the old houses that are gradually being replaced by verticalization.At the top of the building are the communal leisure areas, including a large lounge for events and meetings, a children's play area, a communal laundry room, and, taking advantage of the views of the city center and the sunset, an elevated square with a garden. Two penthouse units also enjoy small private gardens at the ends of the floor.Text description provided by the architects.Located inCuritiba, a city renowned for its urban quality, this project stands out in a neighborhood full of isolated houses, large gardens, and tree-lined streets. For many years, the site housed a substation for a metallurgical company that operated there until the increase in population density made industrial activity incompatible with the surroundings.The concrete structure is kept apparent, with plywood forms on the slabs and beams, and rough boards on the walls. The horizontal circulations are closed off with translucent tiles, allowing people to be seen from outside the building and providing plenty of natural light, which is particularly important inCuritiba, a city known for its many rainy days. On the street-facing façades, the technical areas receive tiles with a similar profile but made from perforated sheets.

Location

Country

Brazil

Source

Source

ArchDaily

URL

More Details

Record type

Project

Sector

Road, Education, Cement, Manufacturing (Industrial), Water Supply and Storage, Car parking, Residential, Commercial, Automotive

Article published date

2025-06-10

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project