logo
ProjectClosed

MUDA IRRG II

The status, timeline and source of this project. A free account opens every field.

Source: World Bank Group

The main objective of the Second Muda Irrigation Project is to raise the productivity and incomes of about 16,000 smallholder padi farming families through improved water management in those parts of the Muda irrigation area which are least adequately served by the existing irrigation and drainage network. In addition, by strengthening agricultural support services, the yield and incomes of all 60

Status
Closed
Sector
Road, Water Supply and Storage, Automotive, Waste Processing and Treatment, Raw Materials, Government
Location
Malaysia
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about MUDA IRRG II

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “MUDA IRRG II” is an infrastructure initiative in the Road sector, located in Malaysia. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The main objective of the Second Muda Irrigation Project is to raise the productivity and incomes of about 16,000 smallholder padi farming families through improved water management in those parts of the Muda irrigation area which are least adequately served by the existing irrigation and drainage network. In addition, by strengthening agricultural support services, the yield and incomes of all 60,000 padi farming families in the Muda area, or 340,000 people, will be improved. To achieve these aims, the proposed project would provide financing for: (a) construction of tertiary canal and drainage systems and farm roads in 37 discrete irrigation blocks; (b) improvements to major outfall drains and natural channels; (c) rehabilitation of coastal bunds; (d) construction of tidal gates, water control structures and escape structures; (e) upgrading of the existing water control communications system; (f) construction of workshops, administration buildings and seed stores; (g) pilot projects, engineering and management studies, a groundwater study and a rural development project feasibility study; (h) purchase of vehicles and equipment for project works and studies; and (i) consultant services and training.

Original sector

Agriculture, Fishing and Forestry

Location

Country

Malaysia

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Road, Water Supply and Storage, Automotive, Waste Processing and Treatment, Raw Materials, Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project