Muddy Creek 543 Culvert Replacement
Sector: Waste Processing and Treatment • Location: Lander, Wyoming, United States of America
Source: Dodge
Trout Unlimited, Inc. (TU) invites qualified entities and individuals to submit proposals for the Muddy Creek 543 Culvert Replacement project.Project Objectives include: 1. Construct a road/stream crossing to mitigate the effects of post-fire erosion and flooding. 2. Provide a safe and efficient road system for access to local communities and nearby National Forest System lands. 3. Restore fish pa
- Status
- Closed
- Sector
- Waste Processing and Treatment, Road, Water Supply and Storage, Commercial
- Location
- Lander, Wyoming, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Muddy Creek 543 Culvert Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Trout Unlimited, Inc. (TU) invites qualified entities and individuals to submit proposals for the Muddy Creek 543 Culvert Replacement project.Project Objectives include: 1. Construct a road/stream crossing to mitigate the effects of post-fire erosion and flooding. 2. Provide a safe and efficient road system for access to local communities and nearby National Forest System lands. 3. Restore fish passage between Douglas Creek and over 15 miles of habitat in the Muddy Creek drainage. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Wyoming |
City | Lander |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Road, Water Supply and Storage, Commercial |
Article published date | 2025-10-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in United States of America
- JACK FOUNTAIN/HOLLOWAY RAY FM SNOWHILL CHURCH TO BRANCH
- West lake sammamish parkway phase 2
- 228th St. SE Roadway Repair near 15th Ave. SE
- Camden Lift Station
- REPLACE EXIST. CONVIENENCE STORE W/ NEW ONE, UPGRADE LANDSCA PE, SITE LIGHTING, DRAINAGE. ADD STARBUCKS DRIVETHRU W/ SPR
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- (N) COMMERICAL SINKS: 3-COMPARTMENT SINK AND 2 ADDITIONAL SINKS WITH DRAINAGE AND WATER.
- NEW ADA BATHROOM PER PLAN AND SPECIFICATIONS AREA 66SF SCREE NED. (N) 4" SEWER LATERAL CONNECTION, (N) WATER FOUNDATION
