Muel Wind Farm Repowering
Sector: Raw Materials • Location: Muel, Aragon, Spain
Source: RWE
The Muel wind farm in Aragon, Spain, was repowered by dismantling 27 old turbines and replacing them with three modern turbines, increasing total installed capacity from 16.2 MW to 19.97 MW. This upgrade more than doubles the energy production, supplying power to 21,000 Spanish homes. The project achieved a zero-waste certification by recycling 99.82% of the old materials.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | completed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Muel wind farm in Aragon, Spain, was repowered by dismantling 27 old turbines and replacing them with three modern turbines, increasing total installed capacity from 16.2 MW to 19.97 MW. This upgrade more than doubles the energy production, supplying power to 21,000 Spanish homes. The project achieved a zero-waste certification by recycling 99.82% of the old materials. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
