logo

Mughalsarai-Lucknow-Moradabad-Ambala-Jalandhar-Amritsar [1150km] Longer Loop Project

Sector: Bridge • Location: Amritsar, Punjab, India

Source: India Investment Grid (IIG)

Project
Closed

Information CAO/C/NR has come up with Mughalsarai-Lucknow-Moradabad-Ambala-Jalandhar-Amritsar [1150km] Longer Loop Project with a ticket size of 310 INR Crores. This project in Railway Track sub-sector involves Laying of New Track/Bridge The current status of the project is Not Applicable Economic/Social Impact of the Project The project involves extension of total 29 loop lines at 19 railway stat

Project Information FAQ

Project Information

5 Q
The project “Mughalsarai-Lucknow-Moradabad-Ambala-Jalandhar-Amritsar [1150km] Longer Loop Project” is an infrastructure initiative in the Bridge sector, located in Amritsar, Punjab, India. Taiyo aggregates data on it from India Investment Grid (IIG).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Information CAO/C/NR has come up with Mughalsarai-Lucknow-Moradabad-Ambala-Jalandhar-Amritsar [1150km] Longer Loop Project with a ticket size of 310 INR Crores. This project in Railway Track sub-sector involves Laying of New Track/Bridge The current status of the project is Not Applicable Economic/Social Impact of the Project The project involves extension of total 29 loop lines at 19 railway stations over Northern Railways that will result in Loop lines at railway stations with extended CSR for stabiling, berthing and handling the operations of long haul trains. This will result in more efficient transport of goods and food grains at an economic rate in reduced time period, in addition to reduction of no. of trains in operation, that will cater for the more efficient and punctual movement of passenger trains.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data