Muhammadu Buhari Second Niger Bridge
Sector: Road • Location: Onitsha, Asaba, Anambra State, Delta State, Nigeria
Source: The Whistler Newspaper
The construction of the 1.6-kilometre dual carriageway Second Niger Bridge began in 2016 under Buhari’s administration, aiming to ease traffic congestion and promote socio-economic integration between the South-East and other regions of Nigeria. The bridge connects Onitsha in Anambra State to Asaba in Delta State, serving as a critical extension of the Enugu–Onitsha Expressway. It was financed thr
- Status
- Closed
- Sector
- Road, Solar, Bridge
- Location
- Onitsha, Asaba, Anambra State, Delta State, Nigeria
- Updated
- 22 Jul 2026
- Source
- The Whistler Newspaper
ConstructChat
Ask ConstructChat about Muhammadu Buhari Second Niger Bridge
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The construction of the 1.6-kilometre dual carriageway Second Niger Bridge began in 2016 under Buhari’s administration, aiming to ease traffic congestion and promote socio-economic integration between the South-East and other regions of Nigeria. The bridge connects Onitsha in Anambra State to Asaba in Delta State, serving as a critical extension of the Enugu–Onitsha Expressway. It was financed through the Presidential Infrastructure Development Fund (PIDF) and the Nigeria Sovereign Investment Authority (NSIA), completed by late 2022 and officially commissioned on May 23, 2023. |
Original sector | Infrastructure |
Location
Country | Nigeria |
State | Anambra State, Delta State |
City | Onitsha, Asaba |
Source
Source | The Whistler Newspaper |
URL |
More Details
Record type | Project |
Sector | Road, Solar, Bridge |
Article published date | 2025-09-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
