MUHURI IRRIGATION
The status, timeline and source of this project. A free account opens every field.
Source: World Bank Group
The Muhuri Irrigation Project includes: (a) construction of about 5 miles of coastal earthfill embankments and a dam of about 1.5 miles across the Feni River Channel; (b) Construction of a reinforced-concrete regulator structure equipped with radial gates and flap gates; (c) construction of one major and 30 minor drainage structures equipped with flap gates, and the improvement of an existing drai
- Status
- Closed
- Sector
- Road, Water Supply and Storage, Automotive, Waste Processing and Treatment, Hydro, Cement, Raw Materials, Government
- Location
- Bangladesh
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about MUHURI IRRIGATION
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Muhuri Irrigation Project includes: (a) construction of about 5 miles of coastal earthfill embankments and a dam of about 1.5 miles across the Feni River Channel; (b) Construction of a reinforced-concrete regulator structure equipped with radial gates and flap gates; (c) construction of one major and 30 minor drainage structures equipped with flap gates, and the improvement of an existing drainage outlet; (d) improvement of 110 miles of natural channels and the excavation of 6 miles of new channels; (e) improvement of 9 miles of existing roads and the construction of 9 miles of new roads for access to the main project works; (f) installation of about 1,100 low-lift pumps to raise water from the channels to adjacent farmlands; (g) provision of workshops, equipment, and vehicles for maintenance of civil works and pumps; (h) construction of offices and housing for project staff; (i) transportation (field vehicles, motorcycles and bicycles), and agricultural equipment (hand sprayers, grain dryers) to facilitate agricultural extension, supporting services; and (j) consultant services to assist the Government in project planning, design, supervision of construction, and evaluation of the impact of the project. |
Original sector | Agriculture, Fishing and Forestry |
Location
Country | Bangladesh |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Road, Water Supply and Storage, Automotive, Waste Processing and Treatment, Hydro, Cement, Raw Materials, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
